七草千岁下马作品:中译英一句话

来源:百度文库 编辑:高校问答 时间:2024/05/10 06:18:15
这个水坝就是为了确保那些工厂充足的电力供应而设计的。(design)

This dam was designed for making sure the electric power to those factories providing in full.

This dam is designed for providing enough electric power of those factories.