预算(三)
序号 名称 规格 单位 数量 单价 合计金额
1 方管 40*40*2 支 2 80.00 160.00
2 ø6圆条 支 1 72.00 72.00
3 角垫 50*100 个 8 12.00 96.00
4 铁板 200*150*5 片 1 10.00 10.00
5 PVC管 支 1 80.00 80.00
6 转轮 个 4 35.00 140.00
7 油化 100.00
8 人工费 个 6 50.00 300.00
直接费用合计 958.00
管理费 直接费用20% 191.60
税费 直接费用4.28% 41.00
利润 直接费用20% 191.60
料损 直接费用6% 57.48
总造价 1439.68元/件

Serial number name specifications unit quantity at a unit cost of the combined amount of one side control 40*40*2 sticks 2 80.00 160.00 2 ø 6 Yuan Article sticks 1 72.00 72.00 3 Kok pad 50*100 a 8 12.00 96.00 4 corrugated iron 200*150*5 films 1 10.00 10.00 5 PVC sticks 1 80.00 80.00 6 runner a 4 35.00 140.00 7 oil-based 100.00 8 labour costs a 6 50.00 300.00 direct costs combined 958.00 management fees direct costs 20% 191.60 taxes and fees direct costs 4.28% 41.00 profit direct costs 20% 191.60 material detriment direct costs 6% 57.48 total construction cost 1439. 68