光明大陆火元素小怪:急!绿色包装英文资料!在线等~~

来源:百度文库 编辑:高校问答 时间:2024/04/28 15:44:20
最好是中英文对照的

As Hewlett-Packard products move from the end of the production line to the customer, they experience a number of potentially damaging forces, including shock from handling drops, vibration from transportation, and compression from stacking in warehouses and vehicles. Hewlett-Packard's distribution environment is particularly challenging because customers often require rapid delivery, and environmental shock forces increase at faster handling speeds. Understanding the distribution environment for HP products, along with having the capability of testing products and packages for this environment, allows the packaging engineers to design protective packaging. They work closely with product designers to optimize the product-package combination, balancing the cost of the additional packaging against the cost of improving the product. This is a function of matching the protective level of the package with the needs of the product, using a minimum of material. The reason for this is simple: shipping costs and material costs increase as the size of the package increases and even small reductions can effect significant savings. In addition, the packaging engineers must keep in mind the environmental (green) aspects of their design in order to meet the and mounting legislative requirements.
站点连接:
http://packaging.hp.com/misc/packaging_is_important2.htm

Solid Waste Handling
By 2005, realize the depollution handling of urban living garbage basically. In part regions within the outer circle (including part of central town of counties), build the service system of classified collection, reduction and resource utilization of the living garbage primarily. All the rural areas with proper conditions in Shanghai shall establish the basic collection and processing system of living garbage. Improve the comprehensive utilization of solid industry waste, and realize the safety processing of dangerous waste basically.
Launch the Liming Backup Burying Farm located in Pudong, accomplish Term-3 Expansion Project of Old Harbor Burying Farm, and define the reserved land for Term-4 project; accomplish the garbage burning plants located at Puxi Jiangqiao, Pudong Yuqiao and Minhang to improve the depollution processing rate of urban living garbage up to 95% or above.
Strengthen the processing and control management of solid industry waste, improve the processing network of solid industry waste, expand the waste recycling range, and improve the comprehensive utilization rate of solid industry waste up to 95% or above.
Construct the rural living garbage collection and processing system, improve the comprehensive utilization of rural organic garbage.
Improve the recycling and resource conversion of the plastic products and the package containers, and handle the "white pollution"; standardize the processing of dreg garbage.
Accomplish the Term-1 Project of Safety Processing and Burying Farm of Dangerous Waste and the construction of Dangerous Waste Relocation Plant, the safety burying volume of dangerous waste shall be as much as 25,000 tons per year, and the depollution burning volume shall be as much as 19,000 tons per year. All the dangerous waste in Shanghai shall be basically processed in the safety way.

站点连接:
http://www.shanghai.gov.cn/shanghai/node8059/node8919/node8942/userobject21ai15715.html