滕王阁序课堂实录视频:翻译一段话 谢谢

来源:百度文库 编辑:高校问答 时间:2024/05/09 05:15:02
1.1用液压叉车升高移动平台, 运移动平台至安装就位点.
2. 找出接长平台, 地脚螺杆四只连接销杆2只, 安装接长平台的地脚螺丝.
3. 移动接长平台与移动平台连接处, 调节接长平台的地脚螺杆至两平台一样高, 在连接触插入2只连接销杆.
4. 用水平尺测试平台的水平, 调节平台地脚螺丝直到水平为止, 调后缩紧螺杆的并帽.
谢绝机器翻译

1.1 press the fork car to go up the ambulation terrace with the liquid, the luck moves the terrace to the gearing to take seat the point.
2. Find out to connect the long terrace, four conjunctions of a feet pole sell 2 of pole, installing a feet screw of connect the long terrace.
3. The ambulation connects the long terrace and moves the terrace conjunction place, regulating to connect long feet pole of the terrace to two terraces similar and high, at link to touch to insert 2 conjunctions to sell the pole.
4. With the level that the spirit level tests the terrace, regulate a feet of terrace screw until level, tighten the pole of after adjust of and hat.

jlk;xzklmewdmikewmdkmdjkfnknt4kt4k3