皮毛上衣怎么搭裤子:帮我翻译一下吧,急用,谢谢

来源:百度文库 编辑:高校问答 时间:2024/05/12 05:16:52
玉瓷漆(普通型,防水型)
产品说明
本品是亮迪公司最新开发的新一代内墙用仿瓷涂料,分为普通型和防水型两种。经本品涂装之表面,无论光泽,手感皆可与瓷砖相媲美,白度90%以上,表面光亮,硬度高,不开裂,不脱皮,并可以配制成多种颜色。
施工工艺:
基层要求平整,腻子要有一定强度,干燥清洁。
本涂料一般要求刮涂三遍,前两遍为遮盖力和抹平性施工,第三遍要求高度平整,三遍均不须打磨,三遍厚度一般为1+0.5MM,中间间隔时间为上一道干透(约2-10小时);最后一道刮涂完成后约5-30分钟(即涂料半干半不干时抛光,视干燥程度掌握抛光时间)。抛光应分多次进行,抛光越好,涂膜硬度和耐水性越好,抛光方法用刮刀空刮,严禁干燥后抛光。
理论耗漆量:1-1.5平方米/公斤
最佳施工温度:5-35度,施工后3天内不可水洗
保存期:12个月(5-34度干燥阴凉处)

The jade lacquer( common type, waterproof type)
The product elucidation
This article is the wall inside the new generation that the bright company of develops lately to use to imitate the porcelain coating, is divided into the common type and waterproof types are two kinds of.Was draw by this article to pack its surface, regardless chatoyant, the hand feeling all can match in excellence with ceramic tile mutually, a 90% of white is above, the surface is shining, the degree of hardness is high, don't open the 裂 , don't shed skin, and can prepare various color.
The construction craft:
The basic level have neat request, getting fed up with the son to want the certain strength, the aridity sweep.
This coating requests to pare off to draw three generally, ex- two in order to cover up the dint and put on the even sex construction, time the third request is highly neat, three all need not to beat to whet, three thicknesses are 1+s 0.5 MMses generally, in the center the partition time for top a dry deeply;( about 2-10 hours)After end pare off to draw to complete together about 5-30 minutes.( namely the coating half stem half not dry hour throw the light, see the dry degree to control to throw the light time)Throw the light should divide many times to carry on, throwing the light more good, draw the film degree of hardness and bear the water more good, throw the light method to get empty to pare off with the drawknife, strictly forbid dry throw the light behind.
The theories consumes to paint the quantity:1-1.5 square meters/ kilograms
The best construction temperature:5-35 degrees, after the construction in 3 days can't the water wash
Keep the period:12 month( dry cool place of 5-34 degrees)

虽然我是一个机械工程师,但是我实在不愿意翻这样的文章。如果按正常的收费,这段文字至少值300

Jade Ciqi (general type, waterproof type) Product description They showed the goods company is the latest development in the new generation Fangci paint walls, divided into two general types and waterproof type. After the goods Tuzhuang the surface, whether sunlight, and feel can compare with the tiles, 90% White degrees, the surface bright, high hardness, not shape, not blistering, and preparing a variety of colours can. Construction techniques : Primary requested formation, Nizi have a certain intensity, dry cleaning. The paint typically require Guatu times, the former twice for the construction of Zhegeli and Moping, three times for highly formation, remember not to shine, thickness generally 1+0.5MM times, lead time for the middle to 2,000 (about 2-10 hours); Finally, the completion of approximately 5-30 minutes Guatu (paint Mix half your time polishing, depending on the extent to dry polishing time). Polishing to be repeated for hours, finishing better, Tumo hardness and sexual Naishui better, polishing methods used scraper air blow, no dry after polishing. A theoretical cost reductions : 1-1.5 m2 / kg Best construction temperature : 5-35 degrees, not washed out after three days Preservation period : 12 months (5-34 degrees dry shady place)